Welcome to ASE Aluminium Windows & Doors !
Moorabbin’s post-war homes were made fast and practical, so plenty of the older frames have warped, leak a little air, or just don’t block heat, cold, or outside sound the way modern families expect. We fabricate and install Entry Doors, French Doors, Pivot Doors, plus wide-span Multi Stack Doors. Each one is meant to swap out tired openings without forcing you into a complete renovation. If you’re installing aluminium doors and windows in Moorabbin now, you’re basically tackling those decades-old draft annoyances in a single sensible upgrade.


With Moorabbin’s food and drink scene growing pretty quickly, more homeowners are pushing out toward courtyards and rear decks. bi-fold doors, and also Corner Opening bi-fold doors, open up living areas for entertaining, which is a common pick with the suburb’s renovating families.


Acoustic-rated awning-style and louvre-style choices, made to help reduce flight-path noise across Moorabbin homes.

Screens, custom-fitted, for everything from industrial-chic upgrades to classic suburban streets.
Yes. Moorabbin sits within the City of Kingston, about eight kilometres from the Clayton South factory, alongside Highett, Bentleigh East, Cheltenham and Mentone. It is one of the closer suburbs on the delivery route.
Moorabbin carries one of the larger light industrial areas in the south east, much of it built from the 1950s onwards. Work in a functioning factory differs from a warehouse conversion: high level windows for ventilation and light, glazing that tolerates knocks, and openings that often sit above roller doors.
Usually the insurer arranges it, but not always. A broken pane is often covered under home or landlord insurance, and the claim decides whether the work goes through a preferred repairer or an installer of your choice. Sorting the claim number and excess first avoids paying twice.
They do expand and contract with temperature, which is why frames are made with allowances built in rather than fitted tight to the opening. On a very hot day a large sliding panel can feel firmer to move than it does in the morning. That is normal and settles as the temperature drops.
That falls to whoever measured. Where ASE takes the site measure, an error in it is ASE’s to correct. Where sizes come from someone else’s drawings or an owner’s own measurements, the unit is made to what was given, which is one reason the site measure is worth having.
Yes, though it becomes a building job as well as a window one. A new opening in a masonry wall needs a lintel over it and the wall made good around it, and in a timber framed wall the studs and any load above have to be dealt with. Both are settled before the window is ordered.